EPR construction sites progress report at the end of february 2010
© Image et Process
Progress of the building works February 2010 - 3 minutes
|
EDF - Flamanville 3 Project
© EDF
Progress of the building works April - June 2009 - 5 minutes
|
EDF - Flamanville 3 Project
© Image & Process
The building site from A to Z Synthesis images - 5 minutes
|
AREVA - Olkiluoto 3 project
© AREVA
The EPR™ reactor - From paper to concrete 6 minutes
|
AREVA - The EPR™ reactor
© Images et Process
The Path of the Greatest Certainty Synthesis images - 6 minutes
|
Introducing the EPR
© Image & Process
General presentation of the EPR: a generation III reactor model 2.30 minutes
|
How does a pressurized water reactor (PWR) work
© Image & Process
Take a virtual tour around a pressurized water (PWR) 6 minutes
|